Uploaded image for project: 'PROFINET Core'
  1. PROFINET Core
  2. PSPNCORE-706

Invalid RTC phase length calculation

    Details

    • Account:
      SPC Profinet Core (SPCPROFINET)

      Description

      When the length of the red period is calculated only the first port is considered. The second port is not taken into account. This leads to an invalid cyclic scheduler configuration when the Profinet Controller is reached via the second port of the device.

        Attachments

          Issue Links

            Expenses

              Activity

                Status Description

                  People

                  • Reporter:
                    AMesser Andreas Messer
                  • Votes:
                    0 Vote for this issue
                    Watchers:
                    0 Start watching this issue

                    Dates

                    • Created:
                      Updated:
                      Resolved: