Uploaded image for project: 'PROFINET Core'
  1. PROFINET Core
  2. PSPNCORE-809

Allows the reporting of plug alarms after Switchover and before the start of the PrmBegin sequence.

    Details

    • Account:
      SPC Profinet Core (SPCPROFINET)

      Description

      It should be possible to report plug alarms after a switchover. Therefore, waiting for the IO-Controller to trigger the PrmBegin sequence is unnecessary.

      There is a case where the IO-Controller starts the switchover but does not trigger the PrmBegin sequence as there is no need to do so. This is allowed in the specification.

        Attachments

          Issue Links

            Expenses

              Activity

                Status Description

                  People

                  • Reporter:
                    RAamidi Redouane Aamidi
                  • Votes:
                    0 Vote for this issue
                    Watchers:
                    0 Start watching this issue

                    Dates

                    • Created:
                      Updated:
                      Resolved: