Uploaded image for project: 'PROFINET Core'
  1. PROFINET Core
  2. PSPNCORE-886

wrong SyncMaster time calculation performed when Sync with FollowUp is used

    Details

    • Account:
      SPC Profinet Core V1 operational (SPCPROFINET)

      Description

      In IRT operation mode when SyncFrames use FollowUp (e.g. because ERTEC400 based device like Scalance X204IRT is in the network), the Delay1ns field of the FollowUp Frame is wrongly used when calculating the SyncMaster time.

       

        Attachments

          Issue Links

            Expenses

              Activity

                Status Description

                  People

                  • Reporter:
                    BMeyer Benjamin Meyer
                  • Votes:
                    0 Vote for this issue
                    Watchers:
                    0 Start watching this issue

                    Dates

                    • Created:
                      Updated:
                      Resolved: