Description
According to CIP Volume 2, Edition 1.27, 9-4.1.4 2Indicators at Power Up":
An indicator test shall be performed at power-up in order to allow for visual inspection of red
and green states for each indicator. The following power-up test sequence shall be used [...]:
- If present, the Module Status indicator shall turn Green for approximately 0.25 second,
turn Red for approximately 0.25 second,
and then turn Green and hold that state until the power-up test has completed.- If present, each Network Status indicator shall turn Green for approximately 0.25 second,
turn Red for approximately 0.25 second,
and then turn Off and hold that state until the power-up test has completed.
Required self test sequence:
# | Module Status | Network Status | Duration [ms] |
1 | GREEN | OFF | 250 |
2 | RED | OFF | 250 |
3 | GREEN | GREEN | 250 |
4 | GREEN | RED | 250 |
Actual self test sequence:
# | Module Status | Network Status | Duration [ms] |
1 | GREEN | OFF | 250 |
2 | RED | OFF | 250 |
3 | OFF | GREEN | 250 |
4 | OFF | RED | 250 |
Step 3 and 4 must be corrected to mach the LED states shown in the topmost table.
Attachments
Issue Links
- relates to
-
PSEISV3-683 Update to EtherNet/IP Core V3.6.0.16